The improvements being considered for the Lake Avenue project are divided into four main components: 

Bicycle Facility Improvements

The corridor will be evaluated to determine the feasibility of implementing the recommended facilities as specified in the MBATP, including:

Advisory bike lanes

 

Shared lanes

Bike boulevards 

Improved crosswalks

1.png

Intersection Improvements

Intersection improvement alternatives will be evaluated at the Wilmette Ave./11th St. offset intersection, including a potential roundabout. Evaluation criteria may include:

Traffic analysis operations

Safety analysis

Pedestrian and cyclist accommodations

 

Impacts on adjacent properties, including the Ouilmette Historic District

Roadway
Rehabilitation

Total roadway rehabilitation

 

Installation of extensive tree protection measures 

Replacements of curbs and gutters

 

Installation of curb-line drainage structures and storm sewer laterals 

ADA-compliant curb, ramp and crosswalk improvements 

Driveway apron and parkway restoration items

Water Main Improvements

4.png

Replacement of existing conveyance main

Replacement of aged 24-inch transmission main

Replacement of all lead services within the project limits

LAKE AT WILMETTE/11TH ST. INTERSECTION ALTERNATIVES
BIKE FACILITY ALTERNATIVES
GREEN BAY TRAIL CROSSING ALTERNATIVES
FINALIST ALTERNATIVES
Two alternatives have been identified as final options:
bottom of page